DCS homepage · wireframe sheet 01 / 06 · plan 1.7
Width
ProjectDCS website · sovereign AI for the GCC
Sheet01 / 06 — homepage
Plan item1.6 – 1.7
OwnersSree · Zunehra
StatusRev A · gate wk 3
01

Hero

2.10

H1 · positioning line

Sub-line names DSAT parentage and the single promise. Two sentences maximum before the first action.

Book a discovery sessionSee the framework
Key visual
abstract — not stock photography
02

The problem — three bottlenecks

2.10

01

Regulatory constraints

Evolving decrees, certification load, no stable target.

02

The black box risk

Autonomous decisions the C-suite cannot explain.

03

The mid-market squeeze

Big 4 fees and multi-year programmes, out of reach.

03

The answer — sovereign by design

2.11
Architecture diagram
agent fabric + sovereignty controls

Compliant by design

Built-in observability

Built-in explainability

Built-in security

04

Five differentiators

2.10 · 2.11

01 foundation

Deep-tech heritage

02 IP

Telemetry engines

03 engine

Agentic AI builder

04 delivery

Onshore–offshore

05 experience

200+ person-years

05

Sectors — five entry points

2.9

Defense

→ sector page

Energy & utilities

→ sector page

Education

→ sector page

R&D

→ sector page

Healthcare

→ sector page

06

How we deliver

2.8
Discover
Architect
Design & build
Train
Operate
Systems thinking · organisational change management · enterprise architecture — infused into every phase
07

Proof — case study module

2.7 · 4.7

Khalifa University

Green chemistry · 2020–24

DEWA R&D centre

Solar testing · 2024

ADNOC · SBRC

Aviation fuel · 2017

Fourth study

Empty state — consent pending

08

Delivery engine

30–40%

cost advantage

GCC-onshore leadership, India-offshore build. Big 4-level architecture without the Big 4 programme.

09

Closing call to action

One ask, repeated from the hero. No competing secondary action.

Book a discovery session

Footer

Solid fill — image, media or copy not yet written. Redline — plan item reference and build note, toggleable above. Type and colour are placeholders; the design system in phase 3 sets both. Sheets 02–06: sector, service, how we deliver, case study detail, about.